Defence Industry Parts Manufacturing
Subcontract manufacturing for primes and tier-1 suppliers in defence and aerospace. The process advances on documents, not verbal agreement: NDA, DFM report, FAI, in-process records, certified dispatch.
01The discipline defence procurement expects
Supplier selection in defence looks at record discipline before price: how technical data is protected, where material comes from, how inspection is documented, how nonconformance is reported. Ortogon answers with a six-step workflow where every step ends in a document handed to the customer.
Drawings are received over encrypted transfer, access is limited to the quoting team and files are destroyed on request. For export-controlled technical data, contact our confidentiality desk first; do not upload via the web form.
02Product groups
- Avionics and electronics enclosures — 7075-T6 / 6061-T6, EMI gasket grooves, thin-wall pocketing
- Structural brackets and fittings — Ti-6Al-4V, load-bearing geometries
- Mechanism, shaft and bushing assemblies — 17-4 PH / 15-5 PH, tight GD&T
- Sheet-metal chassis, panels and consoles — fibre laser cutting + bending + TIG/MIG welding
- Fixtures, gauges and test rigs — production line support equipment
03Six steps, six documents
- 01 Drawing & NDA
- Signed non-disclosure agreement
- 02 Feasibility & DFM
- Manufacturability report
- 03 Quotation
- Price and lead time by quantity break
- 04 First article
- FAI / first article inspection report
- 05 Production
- In-process inspection records
- 06 Dispatch
- Material certificate + lot traceability record
04Certification status
Certificates we hold and those under application or audit are shown separately — the gap between claim and certificate is the fastest way to fail a supplier audit. Current status is on the home page credentials strip. Supplier information form and quality manual are shared on request.
Frequently asked questions
- Do you publish customer names or part images?
- No. For confidentiality, reference customer names and part images are not published; only part type and technical envelope are described.
- Can we visit for a supplier audit?
- Yes. Audits and process reviews at our Yenimahalle / Ankara facility are by appointment.
- Do you provide welder qualifications for welded structures?
- Welding procedure (WPS/PQR) and welder qualification (WPQ) documentation is shared with the quotation file; the standard follows the project specification.

