Skip to content
Ortogon Savunma Sanayi Ltd. Şti. logosuDEFENCE MANUFACTURING
Sector / Defence industry

Defence Industry Parts Manufacturing

Subcontract manufacturing for primes and tier-1 suppliers in defence and aerospace. The process advances on documents, not verbal agreement: NDA, DFM report, FAI, in-process records, certified dispatch.

01The discipline defence procurement expects

Supplier selection in defence looks at record discipline before price: how technical data is protected, where material comes from, how inspection is documented, how nonconformance is reported. Ortogon answers with a six-step workflow where every step ends in a document handed to the customer.

Drawings are received over encrypted transfer, access is limited to the quoting team and files are destroyed on request. For export-controlled technical data, contact our confidentiality desk first; do not upload via the web form.

02Product groups

  • Avionics and electronics enclosures — 7075-T6 / 6061-T6, EMI gasket grooves, thin-wall pocketing
  • Structural brackets and fittings — Ti-6Al-4V, load-bearing geometries
  • Mechanism, shaft and bushing assemblies — 17-4 PH / 15-5 PH, tight GD&T
  • Sheet-metal chassis, panels and consoles — fibre laser cutting + bending + TIG/MIG welding
  • Fixtures, gauges and test rigs — production line support equipment

03Six steps, six documents

01 Drawing & NDA
Signed non-disclosure agreement
02 Feasibility & DFM
Manufacturability report
03 Quotation
Price and lead time by quantity break
04 First article
FAI / first article inspection report
05 Production
In-process inspection records
06 Dispatch
Material certificate + lot traceability record

04Certification status

Certificates we hold and those under application or audit are shown separately — the gap between claim and certificate is the fastest way to fail a supplier audit. Current status is on the home page credentials strip. Supplier information form and quality manual are shared on request.

Frequently asked questions

Do you publish customer names or part images?
No. For confidentiality, reference customer names and part images are not published; only part type and technical envelope are described.
Can we visit for a supplier audit?
Yes. Audits and process reviews at our Yenimahalle / Ankara facility are by appointment.
Do you provide welder qualifications for welded structures?
Welding procedure (WPS/PQR) and welder qualification (WPQ) documentation is shared with the quotation file; the standard follows the project specification.